Construction
and design of gas stations
Based on the practices and experience of leading oil companies, VDS Company offers its Customers an approach to reduce the payback period of construction projects by 20%. It is based on the development and implementation of corporate standards for block-modular technology for the construction of gas stations using BIM technologies at the design stage.
The main sections of the construction of a modular gas station
Fuel technology
Finished building
Monolithic curbs
Fuel technology
Investments within the estimated cost;
Installation speed within 2 days instead of 20 days;
Prefabricated construction instead of monolithic. Delivery of factory readiness equipment: reinforced concrete islands of fuel dispensing complexes;;
Finished building
Free planning: building without load-bearing partitions with the possibility of easy transfer of partitions;
High aesthetics of structures and their interfaces. The main idea is open solutions, both inside and outside;
The speed of installation of the box with finishing is up to 10 days, 2 shifts at 10 hours;
Monolithic curbs
Monolithic curbs does not exceed the estimated cost;
Work takes 60 hours instead of 200 hours with traditional laying method;
Unprecedented aesthetics of small radius corners, building connections;
Unprecedented operation;
Increased resistance to mechanical stress;
The ability to use a raised monolithic side (up to 1 meter) to organize the rebound of the vehicle wheel.